Session: Questions concerning Power Plants life cycle extension and introduction of new clean coal and low carbon power generation technologies and equipments

Policy and instruments for investment in new facilities; diagnostic of equipment conditions and remaining exploitation period, process diagnostic, planning, realization and analysis of revitalization, improvements of mechanical and electrical equipment.

Papers selected for Conference Session titled : Questions concerning Power Plants life cycle extension and introduction of new clean coal and low carbon power generation technologies and equipments

back to the Sessions

  • E2012-005 A Modern Firing System and Retrofit of a T-Type Steam Generator

    Dr. Christian Storm, Dr. Bernhard Pinkert, Dr. Stefan Hamel - Babcock Borsig Steinmüller GmbH, Oberhausen, Germany
  • E2012-006 Bełchatów - Retrofitting the EU Largest Power Plant Site

    Dr. Georg Gasteiger, Dr. Bernhard Pinkert, Dr. Christian Storm, Frank Adamczyk - Babcock Borsig Steinmüller GmbH, Oberhausen, Germany, mgr inż. Krzysztof Matyskiewicz - PGE, Belchatow, Poland
  • E2012-007 2x900MW Supercritical Units for Opole Power Plant, Poland.

    Wieslaw Zablocki - RAFAKO S.A., Krzysztof Burek - RAFAKO S.A.
    Submitted By: RAFAKO
  • E2012-010 Technical and economical aspects of steam turbine retrofits

    Piotr Czerwinski - ALSTOM Power sp. z o.o. w Warszawie
    Submitted By: Piotr-Czerwinski
  • E2012-011 Hybrid or Flexible - Integrated Approach for renewables integration

    Volker Schuele - Alstom Power GmbH - Integrated Solutions, Dirk Renjewski - Alstom Power GmbH - Integrated Solutions, Olivier Clement - Alstom Power GmbH - Integrated Solutions, Fabian Bierewirtz - Alstom Power GmbH - Integrated Solutions
    Submitted By: olivierclement
  • E2012-013 REPOWERING OLDER PLANTS – The view of the HRSG.

    Pascal FONTAINE - CMI Energy, Xavier Dhubert - CMI Energy
    Submitted By: CMIHRSG
  • E2012-016 THE TURBINES MODEL TEST DURING RECONSTRUCTION PLANT, FOR PURPOSE OF HYDROPOWER STATION MODERNIZATION AND UPGRADING

    prof.dr.Miroslav Benišek - University of Belgrade, Mechanical Engineering Faculty, Belgrade, Serbia
    Submitted By: MiroslavBenisek
  • E2012-017 INCREASING CAPACITY OF THE EXISTING HYDROELECTRIC POWER PLANTS BY THE INSTALLATION OF AN ADDITIONAL TURBINE GENERATOR SET

    Slobodan Milić and Ana Krička - Energoprojekt Entel
    Submitted By: Slobamilic
  • E2012-021 INFLUENCE OF THE LOADING REGIMES AND OPERATIONAL ENVIRONMENT ON FATIGUE STATE OF COMPONENTS OF TURBINE AND HYDROMECHANICAL EQUIPMENT AT HYDROPOWER PLANTS

    Miodrag Arsić*, Srđan Bošnjak**, Bojan Međo*** , Meri Burzić****, Brane Vistać*, Zoran Savić* - *Materials Testing Institute, Bulevar vojvode Mišića 43, Belgrade **Faculty of Mechanical Engineering, The University of Belgrade, Kraljice Marije 16, Belgrade ***Faculty of Technology and Metallurgy, The University of Belgrade, Karnegijeva 4, Belgrade ****Innovation Center of the Faculty of Mechanical Engineering, Kraljice Marije 16, Belgrade
    Submitted By: m.arsic22.09
  • E2012-024 AUTOMATION OF SMALL HYDROPOWER PLANT “RASKA”

    Marko Janković, Predrag Ninković, Sava Dobričić, Tomislav Gajić, Jasna Dragosavac, Žarko Janda - Electrical Engineering Institute “Nikola Tesla”
    Submitted By: elmarkoni